Whittier Tunnel: Anton Anderson Memorial Tunnel

Driving from Anchorage to Whittier to play in Prince William Sound? You’ll go through Anton Anderson Memorial Tunnel—the longest (2.5 miles) highway tunnel in North America, and the first designed for -40 Fahrenheit temperatures and 150 mph winds!

The one-lane tunnel must be shared by cars and trains traveling in both directions, and it usually needs to be aired out in between trips (with jet turbine ventilation, another first!). This unique design that enables a single lane of traffic to travel directly over the railroad track saved tens of millions of dollars over the cost of constructing a new tunnel.

Summer Schedule

  • To Whittier: Cars leave on the half hour, from 5:30am to 10:30pm.
  • From Whittier: Cars leave on the hour, from 6am to 11pm.
  • Arrive at least 10 minutes prior to tunnel opening. (Arriving earlier isn’t a waste; park in line, then get out of your car and soak in the scenery.)
  • Give yourself another 20 - 30 minutes to get through the tunnel.
  • The drive is only 10 minutes, but the opening can be delayed, or there can be a line before you enter.

Making a cruise departure?

  • Allow a minimum of one hour to drive from Anchorage to Bear Valley, the tunnel terminus. 1.5 hours is recommended in summer.
  • For early morning cruises (e.g. 9:00am), use the 7:30 - 7:45am tunnel opening into Whittier. (For true early birds, there are openings at 5:30 and 6:30am as well.)
  • For early afternoon cruises (e.g. 1 - 1:30pm), go for the 10:30 - 10:45 or 11:30 - 11:45am tunnel openings into Whittier.

Price

The one-way toll for a private vehicle starts at $13.

Getting There

Coordinates
Latitude: 60.78889
Longitude: -148.804
Driving Directions